We (anyone) know more than we

We (anyone) know more than we

We (anyone) know more than we

a) are able to say, because words are missing – or

b) may say (are allowed to say) because it doesn’t comply with classical dogmas and or other rules.

 

Disruptive #innovations are only effective if we succeed in cracking or bypassing such barriers between the „preconscious“ and „conscious“ level of understanding.

 

We have developed solutions (tools, visualizations…) to overcome those barriers that traditional economics (paradigms) are hindering us to express the experienced real reality we are living in and are filtered out in classic “Economic Theory”.

 

Using this bypass gives management unexpected new freedom, creating integral value (internal AND external, tangible AND intangible, monetary AND non-monetary, social AND economic, …) in order to run a more sustainable enterprise.

 

http://bengin.net/paperse/worlds_and_men010_e.ppt

 

#businessengineering   #sharedvalue   #bteam   #insede   #innovation   #thirdmetric  

 

Business Engineering Systems discloses economic Potential(s).

Business Engineering Systems discloses economic Potential(s).

Business Engineering Systems discloses economic Potential(s).

Mainly based on intellectual capital.

 

Originally shared by Peter Bretscher

 

Who’s afraid of imaging the economic potential? How to map and measure it?

 

Potential cannot be measured directly, but determined ( = calculate ).

Analogously, as for example, the potential or kinetic energy ( in physics ) is not measured, but it can be calculated / determined.

 

There are several ways to determine the potential(s).

Basically, the potential itself does NOT have a monetary unit and is drawn perpendicular to the axis of money. In the picture below the unit is [i$]. Letter “i” stands for „implicit / imaginary“.

 

To calculate the economic potential, it needs two monetary points (Pythagoras).

The picture shows an example of the calculation of the potential based on assets and sales in [$].

But it could also be payroll and sales, project costs and expected revenues, pizza price in a discount store and a pizzeria, total assets and market capitalization….

Using this principle – and correction factors – is it possible to create a balance sheet of the potential…

 

In addition there’s quite a lot more basics, for example on YouTube:

Mapping Intangible Assets too – beyond classic economic mindset:

Mapping Intangible Assets too – beyond classic economic mindset

 

Economic Value Architecture and Engineering 2012 alpha:

Economic Value Architecture and Engineering 2012 alpha

 

Strategic Potential and Performance Quadrants (explicit meets implicit):

Strategic Potential and Performance Quadrants (explicit meets implicit)

 

Or in general:

http://www.youtube.com/peterbretscher

There are „silent movies“ – Notes and links for download pdf are in the „Info“ part of the movies.

 

#businessengineering   #thirdmetric  #sharedvalue #bteam 

 

Time to Reengineer Economics (the models, the theory) – with Original Business Engineering – the solution that makes…

Time to Reengineer Economics (the models, the theory) – with Original Business Engineering – the solution that makes…

Time to Reengineer Economics (the models, the theory) – with Original Business Engineering – the solution that makes Business Administration integral

Only original and authentic:

a) if & when it is potential-oriented.

Base of next model not only considers tangibles, but also the intangible resources / potentials.

b) if & when old values paradigm / metrics expands.

Next value paradigm / metrics measures and visualizes monetary AND nonmonetary value indicators. Simultaneously (Vector Value Metric).

Everything else is facade painting.

Pictures download as pdf: http://bengin.net/dl13/howto_create_sv_01_2013_e.pdf  

#thirdmetric    #sharedvalue    #bteam   

Originally shared by Peter Bretscher

Time to Reengineer Economics (the models, the theory) – with Original Business Engineering – the solution that makes Business Administration integral

Only original and authentic:

a) if & when it is potential-oriented.

Base of next model not only considers tangibles, but also the intangible resources / potentials.

b) if & when old values paradigm / metrics expands.

Next value paradigm / metrics measures and visualizes monetary AND nonmonetary value indicators. Simultaneously (Vector Value Metric).

Everything else is facade painting.

Pictures download as pdf: http://bengin.net/dl13/howto_create_sv_01_2013_e.pdf 

#thirdmetric    #sharedvalue    #bteam